ATS: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
m →Version |
||
| Line 8: | Line 8: | ||
==Version== | ==Version== | ||
*2.0 (1993) | |||
*3.0 (1995) - Requires OS/2 2.0 or later | *3.0 (1995) - Requires OS/2 2.0 or later | ||
[[Category:Schedulers]] | [[Category:Schedulers]] | ||
Revision as of 12:27, 20 July 2021
ATS (Advanced Task Scheduler) is a job scheduler from MHR Software and Consulting.
Features
- Multithreaded 32-bit PM application with online help
- Windows for Log, Status, and Running Tasks
- Unlimited number of tasks, dependencies, and holidays
- Activity logging to disk
Version
- 2.0 (1993)
- 3.0 (1995) - Requires OS/2 2.0 or later